Model NO.: CNC
Lead Time: 15-20 Days
Tolerlance: +/-0.01
Material: 303/304/Steel/as Customer Request
Type: Customized
Trademark: AoRui/customized
Transport Package: Peal Wool Carton Box Packaging Film
Origin: China
HS Code: 73269098
Model NO.: CNC
Lead Time: 15-20 Days
Tolerlance: +/-0.01
Material: 303/304/Steel/as Customer Request
Type: Customized
Trademark: AoRui/customized
Transport Package: Peal Wool Carton Box Packaging Film
Origin: China
HS Code: 73269098
Materials |
45#,S136, SKD11,SKD61, P20,Cr12MoV, 440C, Q235B, high speed steel, 40Cr, 304, 316, PTFE, PEEK, copper, nylon, 5083, 6061,7075,  alloy,brass,copper,bronze, bakelite etc  |
Process |
 CNC milling and turning,drilling,punching |
Treatment |
Nitriding, blackening,sandblasting, anodic oxidation,zinc plating,nickel plating,find sand blasting,black anodize,heat treatment, phosphating,chrome plating, ect. |
Tolerance |
+/-0.01mm |
Software |
Auto CAD,CAD,IGS,STEP, SLDPRT,DXF |
Equipment |
CNC machining center, CNC lathes,  milling machines. Grinding machines NC lathes, lathe machine, Punch machines, . advanced high-end equipment:
Â
|
MOQ |
NOÂ MOQÂ limited |
Lead Time |
Depend on your order |
Inspection |
100% inspection before shipment |
Payment term |
T/TÂ ,L/CÂ ,etc |
Packaging |
1)plastic bag,carton, pearl wool,wooden carton |
3) As customized specifications. |
Shipment Terms |
1) 0-100kg: air freight priority |
2) >100kg: sea freight priority |
3) As customized specifications. |
Company show:
Others product:
FAQ:
1.Are you a manufacturer?
--Yes, we are. Warmly welcome to visit our factory at any time.
2.How does the ADL control the quality?
--During processing, the operating machine worker inspect the each sizes by themselves.
--After finished the first whole part, will show to QA for full inspection.
--Before shipment, the QA will inspect according to ISO sampling inspection standard for mass production.
3.How to handle the complains?
--If happen any complaints after got the goods, pls show us photos and detail complains points, we will check with the production department and QC depart. Immediately and give solving solution. If need re-make, we will arrange re-make urgently and ship you new replacement. We will bear all the cost (including shipping cost).
4.What's the payment term?
--50% deposit, 50% balance by T/T before shipment when order amount over 5000USD.
5.What's the delivery time?
---Normal, 5-7 working days for sample. 12-30 working days for mass production.
--If any urgent parts, we can provide preferential processing and control the delivery time as you required.
6.What is the standard of package?
---Separate Blister plastic box or Bubble Wrap/Pearl Wool, keep no scratch and damage.How to order:1. Send us your drawings with standard code and dimension.
2. We quote you with reasonable price asap.
3. Get agreement with price and sign PO or Contract.
4.Prepay 50% of total amount before production (for new customer), and the balance need to be paid within 30 days after delivery.
5. If sample required, we will make sample first.
Materials |
45#,S136, SKD11,SKD61, P20,Cr12MoV, 440C, Q235B, high speed steel, 40Cr, 304, 316, PTFE, PEEK, copper, nylon, 5083, 6061,7075,  alloy,brass,copper,bronze, bakelite etc  |
Process |
 CNC milling and turning,drilling,punching |
Treatment |
Nitriding, blackening,sandblasting, anodic oxidation,zinc plating,nickel plating,find sand blasting,black anodize,heat treatment, phosphating,chrome plating, ect. |
Tolerance |
+/-0.01mm |
Software |
Auto CAD,CAD,IGS,STEP, SLDPRT,DXF |
Equipment |
CNC machining center, CNC lathes,  milling machines. Grinding machines NC lathes, lathe machine, Punch machines, . advanced high-end equipment:
Â
|
MOQ |
NOÂ MOQÂ limited |
Lead Time |
Depend on your order |
Inspection |
100% inspection before shipment |
Payment term |
T/TÂ ,L/CÂ ,etc |
Packaging |
1)plastic bag,carton, pearl wool,wooden carton |
3) As customized specifications. |
Shipment Terms |
1) 0-100kg: air freight priority |
2) >100kg: sea freight priority |
3) As customized specifications. |
Company show:
Others product:
FAQ:
1.Are you a manufacturer?
--Yes, we are. Warmly welcome to visit our factory at any time.
2.How does the ADL control the quality?
--During processing, the operating machine worker inspect the each sizes by themselves.
--After finished the first whole part, will show to QA for full inspection.
--Before shipment, the QA will inspect according to ISO sampling inspection standard for mass production.
3.How to handle the complains?
--If happen any complaints after got the goods, pls show us photos and detail complains points, we will check with the production department and QC depart. Immediately and give solving solution. If need re-make, we will arrange re-make urgently and ship you new replacement. We will bear all the cost (including shipping cost).
4.What's the payment term?
--50% deposit, 50% balance by T/T before shipment when order amount over 5000USD.
5.What's the delivery time?
---Normal, 5-7 working days for sample. 12-30 working days for mass production.
--If any urgent parts, we can provide preferential processing and control the delivery time as you required.
6.What is the standard of package?
---Separate Blister plastic box or Bubble Wrap/Pearl Wool, keep no scratch and damage.How to order:1. Send us your drawings with standard code and dimension.
2. We quote you with reasonable price asap.
3. Get agreement with price and sign PO or Contract.
4.Prepay 50% of total amount before production (for new customer), and the balance need to be paid within 30 days after delivery.
5. If sample required, we will make sample first.
Galperti Bearing
Galperti Bearing,Slew Drive ,Slewing Ring Turntable ,Swing Bearing Replacement
Slewing Bearing Co., Ltd. , http://www.slewingbearing-manufacturer.com